top of page

Full rollout
The rollout‑timelines below shows how Protection Sets are introduced to your Microsoft 365 environment in waves.
Each wave appears in sub phases as a horizontal bar: dark blue marks the planned (base) work, and light blue indicates a possible extension.
With the entire plan visible below, it is a matter of following the logical flow.
Rollout Stages
These are contained in four waves, each wave has a chronologically order as everything works together.
Protection Sets Staged Rollout Timeline
Wave 1:

Wave 2

Wave 3

Wave 4

bottom of page